Wednesday 19 June 2019

Progress

Meet Watney. This little fellow seems to like watching what's going on
Today, it was supposed to rain all day, so we were going to take a van-load of stuff down to Sheppey. On waking, this morning, it was dry. I took advantage of the dry weather and got cracking on the rest of the workshop dismantle. The first job was to deal with the last of the rafters and get de-nailing. Once done, it was on to the cladding. Within a couple of hours, the back was stripped and Sue, and I go to the de-nailing, all this while dodging the showers. All this was being watched by our resident fox. One of many, he seems to be the bravest of all of them. None of the other will let us get this close.

The cladding is being stripped off
After rain forced an early lunch, we managed to get the front stripped and de-nailed. While Sue was finishing off the last of that, I attacked the window lining and sills. Lots of hidden screws and copious amounts of construction adhesive made this job a lot harder than it looked. A bit of sawing and the use of a 36 inch Gorilla-bar soon sorted out the stubborn frames.

Just the frame to go and it will be no more
All in all, a good day's work and a long way forward. With luck, the rest should be down and de-nailed by tomorrow evening. That is, weather permitting.

Ralph.

No comments:

Post a Comment