Friday, 21 June 2019

Gone!


...and then it was no more
 It has gone! All but the floor that is. This was first thing this morning, after a quick dash to Sheppey with yet another load of timber. I have spent the rest of the day de-nailing the wood from the frame and starting on the floor. I hate de-nailing. There is no pleasure to be had from being destructive, although the act of de-nailing does mean the pile of sticks is transformed into reclaimed timber ready for the next project, the new workshop.

The floor this morning
 The frame has now been de-nailed, and I started on the floor, but sore hands and old age stopped getting that done tonight. Tomorrow will see it finished.

Ralph

Wednesday, 19 June 2019

Progress

Meet Watney. This little fellow seems to like watching what's going on
Today, it was supposed to rain all day, so we were going to take a van-load of stuff down to Sheppey. On waking, this morning, it was dry. I took advantage of the dry weather and got cracking on the rest of the workshop dismantle. The first job was to deal with the last of the rafters and get de-nailing. Once done, it was on to the cladding. Within a couple of hours, the back was stripped and Sue, and I go to the de-nailing, all this while dodging the showers. All this was being watched by our resident fox. One of many, he seems to be the bravest of all of them. None of the other will let us get this close.

The cladding is being stripped off
After rain forced an early lunch, we managed to get the front stripped and de-nailed. While Sue was finishing off the last of that, I attacked the window lining and sills. Lots of hidden screws and copious amounts of construction adhesive made this job a lot harder than it looked. A bit of sawing and the use of a 36 inch Gorilla-bar soon sorted out the stubborn frames.

Just the frame to go and it will be no more
All in all, a good day's work and a long way forward. With luck, the rest should be down and de-nailed by tomorrow evening. That is, weather permitting.

Ralph.

Friday, 14 June 2019

It is getting easier...

The roof is coming off and the plants are getting in!
A trip to our storage with a van load of 'stuff' including all the wall covering MDF, meant the morning was written off today. That along with some paperwork and a long conversation with BT regarding the telephone and broadband move, resulted in me not getting out to the shed until late afternoon.

With the rain seeming gone for the foreseeable future, I was keen to get on with it. Out with the ladder and up onto the roof, claw hammer in hand, I started to remove the roofing felt from the back of the roof. This is the side adjacent to the neighbour's garden. Not wanting to disturb her to gain access from her side, I was pleased that removing the felt was easier than I had suspected, fighting with the overhanging vegetation aside.

The old felt rolled up easier than I was expecting
Disposing of the used felt is a bit of a pain, so, for now, it is being rolled up and will be transported to our storage until on the Isle of Sheppey after the move, when I can take it to the tip. With only a week or so left until the move, that is one job that can wait.

With the roof covering removed, the plywood sheets are pried up and dragged over the roof to be slid down into the path alongside the workshop. These are a bit tatty around the edges and full of nail holes. Today in this world of up-cycling and reclamation, they can be described as having 'character'. As such, they will be saved and have a new life in the future. For now, they too will be transported to 'The Island'.  It will be stored for disposal later. That is, unless I can think of a way of recycling it. Any ideas? Maybe the roofs of a few bird tables, perhaps? Either way. It is something that can wait for now.

Not too much achieved today, but at least it is starting to look as if something is happening. Once the last of the roof covering is off, the bet will be the windows and door, and then the rafters, ridge and collar-ties. That will probably be Sunday as tomorrow we have our goodbye drinks, so I assume not much will happen above maybe getting some more sheets off the roof. 

The double glazed units will be recovered for use in the new workshop
  Ralph.

Thursday, 13 June 2019

Rain

Letting the light in - And the rain!
It has been raining for the past couple of days, but before it set in, I did manage to get some more of the felt off the roof and get another sheet of ply removed. I am so pleased I had only used 12mm ply on this roof. When I built the workshop, some fifteen years ago, I had not envisaged I would be taking it apart. The plan was to convert it into a home office for the new owners, whenever that might be. As it turned out, I have ended up dismantling it and taking the component parts with us, as the people we have sold the house to were going to demolish it. By offering to do it for them, I get to keep all the material to build a new workshop at our new house.

Now all I have to do is dismantle it and move it. Sounds simple if you say it quickly!

While it has been raining, I don't fancy clambering about on the roof so I have been lifting the floor so the rain can go straight through. I have also been cleaning up and de-nailing any timber that has been laying around. Hopefully, the weather will be dryer for the next few days, and some rapid progress will be the subject of my next post.

Ralph.

Sunday, 9 June 2019

A few days in...

From the outside, nothing has changed
Work has been continuing at a pace, although from the outside it looks as if nothing has changed. All the work has been on the inside. All the wall coverings have been removed to expose the insulation, which has been removed and bagged up, ready to be transported to our 'holding facility' in deepest Kent.

Stripped out ready for the roof to be removed
The interior is now completely stripped out with only the lighting left in place. This will be stripped out next, and the roof removed. The empty space will still be used as a 'field' workshop; hence, the saw-frame set up waiting to accept the full sheets of ply that make up the rood covering. Some of these have suffered water damage over the past winter, where I held off recovering the roof as I was not sure what was going to happen to it. I am so pleased I did not get around to doing it last summer as it would have been a total waste of time and money, now it is being dismantled.

Now all the interior has gone I can take off the roof and not worry too much about it raining, after the lighting has been removed, of course!

Ralph.    

Thursday, 6 June 2019

Dismantling the workshop begins...

The wall covering and insulation is going first
As I mentioned in my previous blog, we are dismantling the workshop so we can take it with us to our new house. Now it is almost empty, the first job is to remove the wall covering. The walls are clad with 12mm MDF to provide a firm base to fix to without having to revert to special fixings. It was screwed to the wall studs using carcass screws, countersunk and filled to present a clean flat wall surface. At the time of building, I had no thoughts of ever removing the boards.

In order to remove the boards, each fixing hole has to be drilled out and the head of the screw 'picked' clean before the driver can get a grip. An old brad-point bit chucked into a cordless drill does the job and made it easier than I had expected.

Drilling out the filler to expose the screw heads
Once the boards have been removed it is time to had over to the 'insulation recovery officer' AKA Sue. The Insulation is recovered intact, three sheets at a time.

The insulation is in surprisingly good condition
The insulation is a 'fit' between the studs and comes away without any drama. Sue's gauntlets were purchase specifically for this job and prevent the fibres contacting with her skin. Personally, I don't find the fibres irritate my skin, but it is still wise to wear protection when handling this stuff, or better still, get the missus to do it instead!

Rolling the insulation, nice and tightly
As the insulation is perfectly serviceable, we decided to recover it for re-use in the new workshop. It is rolled tightly and then stuffed into a black bin-bag.This is not as easy as it looks and requires a qualified engineer with the appropriate experience; decades of stuffing bed quilts into covers.

Experience matters. Sue makes it look easy
Once tamed, the insulation is sealed in its bag ready for onward transportation. Each bag contains three strips, enough to insulate four feet of seven feet high wall. We will have a fair few bags of it by the time we have finished.

Another one sealed up
More of the same for the next couple of days and then we will be on to the windows, door and the roof. The only problem is going to be disposing of the roofing felt. I might roll it up and see if I can flog it on eBay... Wadaya reckon?

Ralph.

Tuesday, 4 June 2019

A year on, and what a year it has been...


A few days after my last post here, back on 20th May 2018, I was feeling a bit strange; listless and a bit achy. I was just not feeling my usual cheery, happy-go-lucky, self (my description of my general demeanour - some may disagree). I decided to visit the local doctor. This was not as simple as I first thought.

Back in 1999, Sue and I were looking after her father's home, after his death, until it was sold. As we were spending most of our time there, we had registered with the local doctor. Since then, I had not had any reason to visit a doctor, so I was doctor-less. I had to re-register with my original surgery. This I did and was instantly booked in with the nurse for a blood pressure test and sent off to get a blood test. This I did, and the next day, I received a telephone call asking me to have some more blood tests and to make an appointment to see a doctor. Not reading anything into this I just did it, thinking it was all just the NHS catching up with my medical notes.

A couple of days later, I saw a doctor, who asked me "Did you know you are diabetic?" "What!" "You have type two diabetes" I was utterly gob-smacked. While I was computing what he had just said, I was aware of him telling me to "stay off the milk-shakes". He made several other unhelpful remarks and told me I needed to cut down on my sugar intake and eat properly. This coming from a man who was obviously overweight himself. He told me to make an appointment with the nurse for more tests a few days later.

I was so shocked that I did not think about his assumptions that I was a fast-food eating couch potato, until afterwards when I got home and was talking about it with Sue (My other half). I went to see the nurse, who was most helpful and explained I should try and lose some weight, eat fewer sugary foods and fewer 'bad' carbohydrates. By now, I had read up about my diagnoses and was starting to understand the implications. She also booked me on to a one-day course that explained exactly what type two diabetes is and how to deal with it. She also booked me an appointment with the practice's diabetes specialist, who just happens to be the principle doctor at the practice. He is all together a much better doctor than the first doctor I saw, who must have been a temporary addition, as I have not seen him since.

All this was happening just as we were thinking of putting the house on the market. It was also the start of the hottest summer we have had, here in the UK since 1976. Once I understood what was happening to me, I took it all on-board and set about doing as I was advised. The biggest problem was the medication. The side effects were far worse than the condition, and it took me a full six months to get used to the medication.

This meant the house did not get on the market until November. We had a buyer by December and accepted an offer in January. Since then we have been mucking about with solicitors, surveyors and all manner of questions. Finally, we have exchanged contracts, and completion is now just a matter of a few weeks away, very few!

Over the past year, I have lost several stone in weight, six inches off my waistline and taken up regular exercise. My last trip to the doctor, a couple of weeks ago, confirmed that I am now in the 'normal' range as far as all my test results are concerned and I am no longer classed as being diabetic. The doctor was amazed that I had reversed my situation is just a year. I am now off the blood pressure medication, and the stuff for diabetes has been halved for the next six months, to get me off of it more slowly, rather than a sudden stop. To say I am delighted is an understatement. I feel so much better and have much more energy. That is apart from the stress of having to replace my entire selection of clothes. The only things that still fit me are my socks! Even my fishing hat falls down over my eyes. Who would have thought it possible to lose weight from around one's head!

What next for the Workshop?

When we put the house on the market, I had decided to leave the workshop behind as a home office for the new owner of the house, and build a new one from scratch at our new house. To my surprise, he has decided he does not want it and was going to have it demolished. I jumped in and offered to take it away for nothing. He was delighted, and I have all the materials I will need to rebuild it at the new house. It will not rise again in its current form, in fact, I am not sure how it will end up. At the moment. We also have a small shed that we use as a woodturning shed, that will stay behind. We will have to decide precisely what we really need. The current workshop is big, and we don't really need a space that size in one building. Maybe we will have two or three smaller workshops to cover the various thing we want to do in future. The jury is still out on that one, and no plans will be made until we are ensconced in our new abode.

Now the clock is ticking, it will be a race to get the workshop down before completion, but I do like a challenge! I will shoot some pictures of the workshop being dismantled as I go and post the story here. I had planned to cut the cladding to manageable lengths as it will not need to be as long as it is now. That way, it will fit inside the van and negate the need for a roof rack. However, today we have just booked a 7.5 tonner, and that will be more than long enough to take the full length so I will not make more work for myself unnecessarily. De-nailing the tongue and groove cladding does damage the surface, and it will only be reused on the back and out of the way places of any new buildings. We have already decided to use new material on the sides that are in view. Just what we are going to use remains, again is something that is yet to be decided upon, but whatever we do it will not be dark 'shed' brown this time.